My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07092
DRMS
>
Back File Migration
>
Revision
>
REV07092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:01 AM
Creation date
11/21/2007 9:39:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
4/29/1997
Doc Name
WEST ELK MINE C-80-007
From
DMG
To
MIKE BOULAY
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />RECLAMATION COST EUIR9ARY FORM <br />PERMIT NUMBER C-80-00"1 PREP. BY ELH FILENAME: 0007-0 <br />DATE: 29-Apr-97 OPERATION: West Elk Mine <br />PERMIT ACTION Permit Revision No. 7 <br />GRAND TOTAL BOND AMOUI9T $8,]6],692 <br />I. DIRECT COSTS =.__________ <br />A. EARTHWORK ~ EACKFILLING fi ROUCH GRADING <br />Task N~ Task Desc apt ion <br />1 ~ Portal Bench <br />2 ~ Powder Magazine (including road to magazine) <br />3 ~ Substation <br />9 ~ Haul coal fi 11 Erom Stack Tubes to Waste Pile <br />5 ~ Haul coal ma[erral from Silo Area co Waste Pile <br />6 ~ Shop/Warehouse <br />7 ~ New Office Building/Bath House <br />B ~ Parking lot <br />9 ~ Water Storage Tank (including road to ca nk) <br />10 ~ Sylvester Gulch Ventilation Fan Pad <br />11 ~ Haul coal material ® Loadou[ [o Refuse Pile <br />etockpale ac crusher [o waste Pile <br />50 ~ Haul coal ® new Stack TLbe co Refuse Pile <br />51 ~ Haul coal m Stack[ubes to Refuse Pile <br />60 ~ Regrade drill pads and mud pits <br />65 ~ Regrade drill pad and mud pits <br />6E ~ Regrade 1.2 million gallon wager tank pad <br />H2A ~ Backfill and grade storage bench <br />SB ~ Hackf ill Lone Pine Gulch Fan Bench <br />226 ~ Haul substation backfill material <br />228 ~ Regrade ventilation shaft site <br />0 <br />Cost (51 <br />$39,052 <br />$300 <br />$26'1 <br />$36,199 <br />$25,7]6 <br />$2,022 <br />$3, BB2 <br />$9,366 <br />5279 <br />$664 <br />$9,515 <br />$1ae, ass <br />$152,431 <br />5372 <br />$3]2 <br />$45] <br />$94,403 <br />$32,949 <br />$24,]68 <br />$95.474 <br />Subtotal (A1 $631, OBB <br />sheet 1 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.