Laserfiche WebLink
LLv <br />HOURLY PRODUCTION: <br />Job Condition Corrections <br />Alc. = T, 000 ft. <br />Alc. adj us[ment .... ....... <br />Job efficiency ... (lsh/d) <br />Ne[ CoLLeCt ion9 <br />Load Equipment Capacity <br />_______________________ <br />Rated capacity <br />Bucket fill factor <br />Adjusted capacity <br />Truck Capacity <br />Sheet 2 of 3 <br />Tn;ck/Load Team Support Equipment <br />Truck Loader Load Area Dump Area <br />_________________________________________ <br />1.000 1.000 N/A 1.000 <br />0.030 0.830 N/A O.B30 <br />0.830 0.830 N/A O.B30 <br />9.500 LCY (nominal heaped) <br />-------- Fill material description: <br />0.900 Other - soil, boulders, roots (BO-100F) <br />4.050 LCY <br />weight Basis: ~ Volume Basis: <br />Material weight = 7.,550 lbs/LCY ~ Struck capacity = 8 .00 <br />Mat. description - ---____ ~ Heaped capacity = 10 .00 <br />Earth - Dry packed ~ ---- --- <br />____________________ ________________ ~ Average = 9 .00 LCY <br />Rated payl oatl = 26,000 lbs. ~ ---- --- <br />Payload volume = 10.20 LCY ~ Max. Avg . Volume = 9 .00 LCY <br />Adj. Crvck volume based on discreet no. of loade r passes 8 .10 LCY <br />Load Equipment tyc le Time <br />Number of discreet loader passes required to fill [ruck 2 <br />Track loatlers- ------- <br />Load material description: N/A <br />_______________________________ <br />Excavators/Shovels - cycle time vs. job Condit ron racing: __________ <br />N/A _ <br />- selected value within basic rating N/A <br />Track loaders - basic cycle time elements: Load Cime = N/A min. <br />Maneuver time = N/A <br />Dump time = 0.09 <br />Ulld d]U9ted BaS le CYC1E [lme = 0.500 min. <br />Nhee l/Track loaders- ------- <br />Cycle Time Factors: Description Factor (min.l <br />Material -Mixed material 0.020 <br />Pile condition -Conveyor or dozer piled 10'h and up 0.000 <br />Truck Ownership -Common ownership of trucks 6 loaders -0.040 <br />Operation -Constant operation -0.090 <br />Target -Nominal Cargel 0.000 <br />Net cycle Cime adj. _ -0.060 min. <br />Atl]usced Bae1c tycle Time 0.440 min. <br />Total loatl time per Crvck incl. exchange time adj.• 0.530 min. <br />•Ibu lk of 1st pass completed during truck exchange) ------- <br />