Laserfiche WebLink
2z1 <br />Truck Cycle Time <br />________________ <br />Exchange = 0.60 <br />Load = 0 530 <br />Maneuver S dump = 1.00 <br />Travel Time (haul 6 return): <br />Road contl. descr.:Pirm, smoc <br />Haul route <br />Road Length Grade <br />seg. q If [1 res. (tl <br />____________________________ <br />1 900 0.00 <br />Return route <br />1 900 0.00 <br />Sheet 3 of 3 <br />min. Adj. for altitude 0.60 min. <br />min. " = 0.53 min. <br />min. " = 1.00 min. <br />th, rolling dirt /1[. surfacetl road, maintained <br />Rolling Total Velocity Travel Cime ` <br />res. Iq res. (t) Ifpm) Imin) <br />__________________________________________ <br />3.00 3.00 2994 0.56 <br />______________________________ <br />Haul time = 0.56 min. <br />_______________________________________ <br />3.00 3.00 3360 0.48 <br />____________________________________________________________ <br />•SSt fi last seg. adj. for acce 1. /decel. Return Cime = ______ <br />0 ___ <br />.98 _ <br />min. <br /> Total Truck Cycle Time = 3 .17 min. <br />Loader Unit Prod.= 4]0.09 LCY/Hr - Adi. for efficiency= 356 .9] LCY/Hr <br />_________ <br />'Crock Unit Prod.= 1:3.13 <br />LCY/Hr - Adz. for efficiency= _____ <br />127 ___ <br />.10 <br />LCY/Hr <br />_________ <br />Optimal number of [tucks per loading unit _____ ___ <br />3 <br />Selected number of trucks per loading unit 3 <br /> Hourly truck team production 381. 29 LCY/Hr <br />Net Hourly Truck/Loader Team Production 356. 9] LCY/Hr <br />Net Hourly Multiple T/L Team Production 356. 9] LCY/Hr <br />JOB COST: <br />Flee[ sire 1 T/L Team lsl Total Sob Time: 194. 9] Hours <br />________ <br />Unit Cost $1.138 <br />/LCY Total Job Cost: _________ <br />$58,908 <br />