Laserfiche WebLink
Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br />Task No.: 220 ~----------------~~~~--------------Prepared by SLB <br />Pexmrt No.: C-BO-00] Filename C00]-220 <br />Date 28-Apr-9] Operation Nest Elk Mine <br />__________________ <br />_____________ <br />Permi CCing action Permit Revision No. ] <br />sheet 1 of 4 <br />Task description Remove all structures <br />_________________________________________________________________________________________________ <br />MEANS Location Adj us[me nt: 96.60! of base unit costs - MEANS SITE WORK d LANDSCAPE COST DATA 199"1 Edition <br />STRUCTVRE / FACILITY / EQUIPMENT DESCRIPTION <br />VENTILATION FACILITY AREA <br />Intake shaft collar <br />-base/footer <br />Exhaust shaft Collar <br />-base/footer <br />Main fans/motor houses (21 <br />-foundation (21 <br />-fan ducting <br />Standby generator for fans <br />Reta rning wall <br />Stairway <br />-landings <br />-footing <br />Sinking Hoist building (intake bench) <br />-foundation <br />Fenced storage compound <br />Work shop <br />-Eov ndation <br /> MEAWS BASE ADJUSTED <br />DIMENSIONS <br />________________________ COMPOSITION <br />I....-.......I QUANTITY <br />.........~ UNIT <br />I========I UNIT COST <br />-__==_=====I TOTAL COST <br />....._______ <br /> <br />34' diameter, 15" Chic I I <br />concrete <br />107 I I <br />1rn.ft. <br />$10 I <br />.88 <br />$1,123 <br />93'L x 40'W x 4'ch. concrete 6,880 sq.ft. $20 .60 $136,909 <br />2B' diameter, 12" chic concrete 88 lin.ft. $9 .89 $840 <br />74'L x 42'W x 9'th. concrete <br />I I 5,]12 sq.ft. <br />I I $20 .60 <br />I $113,667 <br />(21 B'W x 30'L x 9'th coot tete <br />I 160 sq.ft. <br />I I $20 .60 $3,189 <br /> <br />(2)280'L x B'W x 10'H <br />metal <br />22,900 <br />cu.ft. <br />$0 I <br />.18 <br />53,895 <br />8'W x 30'L x B'H <br /> <br />I metal <br />I I <br />I 1,920 <br /> <br />I cu.ft. <br />I I <br />I $0 .18 <br />I <br />I $Jl4 <br />I <br />I <br />I <br />35'H x 3B 0'L I <br />I <br />I <br />geotextile I <br />I <br />I <br />380 I <br />I <br />I <br />li n.fC. <br /> <br /> <br />155 I <br />I <br />I <br />.40 <br /> <br /> <br />5"1,099 <br />9'W x 50'L x 10'H steel 2,000 cu.ft. $0 .18 $398 <br />(6)6'W x 6'L x 6"th. concrete 216 sq.ft. $2. 91 $607 <br />1' x 2' concrete 12 lin.fC. $9. 85 $119 <br />20'W x <br />I <br />I <br />I 30'L x9'[h. concrete <br />~ I <br />I I <br />I I 600 <br />I <br />I <br />I sq.ft. <br />I <br />I <br />I $20. 60 <br />I <br />I <br />I $11,940 <br />I <br />I <br />30'W x <br />I <br /> <br />75'L I I <br />I I <br />chain link <br />I I I <br />~ <br />210 <br />I I <br />I <br />lin.Et. <br /> <br />$1. I <br />I <br />68 <br /> <br />$341 <br /> <br />90'W x <br />I <br />I <br />I <br />50'L <br />concrete <br />I I <br />I I <br />I I <br />2,000 <br />I <br />I <br />I I <br />sq.ft. <br />I <br />~ <br />I <br />$2. I <br />98 <br />I <br />~ <br />54,"!91 <br /> <br />I <br />I I <br />I <br />TASK <br />I <br />SUBTOTAL - <br /> <br />sheet I <br />I <br />1 <br /> <br />$335,13"1 <br />