Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />P. MISCELLANEOUS RECLAMATION TASKS <br />Task q~ Task Description <br />------I---------------------------------------------- <br />~ Dredge Pond hID-4 (2/yrl over 10-year <br />liability period -1 pond o 5450 • 20 <br />~ Source: Wes[ Elk <br />208 ~ Demolish Building Adjacent to the RW IG Building <br />700 ~ Remove Lone Pine Gulch Discharge Pipe <br />220 <br />ADDITIONAL STRUCTURAL DEMOLITION TASKS <br />Remove Sylvester Gulch Facilic iee (PRO]) <br />Cosc ($1 <br />$9,000 <br />51,150 <br />58,0]8 <br />$1,114,262 <br />Subtotal (P~: 51,172,450 <br />sheet 9 of 10 <br />