My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07031
DRMS
>
Back File Migration
>
Revision
>
REV07031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:59 AM
Creation date
11/21/2007 9:39:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977053
IBM Index Class Name
Revision
Doc Date
7/8/1994
Doc Name
FAX COVER
From
ASPHALT CONSTRUCTORS INC
To
MLRB
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..J U L~- 8- 9 4 F R I 1 6 5 5 A S P H A L T C O N S T R U C T O R S P_ 0 2~ 0 3. <br />• • <br />Ati,~ CONSTgU~~ <br />,~54`~ P ~I °rP,~ <br />7040 W. Hwy. 160 P.O. Box 449 Aiamosa, Co. 81101 (719) 5896671 <br />July 8, 1994 <br />Department of Natural Resources <br />Division of ;Minerals & Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Att: Jim Stevens <br />RE: Smith Pit II 1+1-94-074 <br />Dear Jim: <br />In reference to voiar inadequacy letter dated July 7, 1994, wr, <br />offer the following addendums to our application packet: <br />Exhibit C: <br />1. We hereby commit to seeding the topsoil stockpile with the <br />same seed mix and application rate as specified in the <br />reclamation plan. No fertilizer will be used, seedbed <br />preparation will consist of discinq or harrowing prior to <br />drilling the seeA. Work shall be performed in the fall of 199a <br />once topsoil is stockpiled. <br />2. The asphalt plant is 100'>" portable. We will be submitting a. <br />revision promptly to the M77-OS3 permit requesting permission to <br />set the plant there. <br />Exhibit D: <br />Efforts shall be made to prepare the seedbed. The area shall <br />either be disced or harrowed prior to drilling the seed. It is <br />not anticipated that fertilizer will be needed to restore the <br />vegetation to its present state. <br />Exhibit F: <br />We did not contact the COOH Water Quality Control hecause we knew <br />that no storm water would be leaving the property. Upon receipt <br />of your letter I contacteA Cathv Dolan with Water Quality Control <br />at 303-692-3500. We discussed the topography of the permit area <br />and She stated that a storm water permit was not neces5arv. Shn <br />said that if written verification was needed, I would neeA r.o <br />send her a letter and she would respond. In the interPSt of our <br />July 12 date, I did not send the letter. If you desire me to <br />follow this up, please advise. <br />Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.