My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV07021
DRMS
>
Back File Migration
>
Revision
>
REV07021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:58 AM
Creation date
11/21/2007 9:39:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Name
NOTICE OF PROPOSED DECISION
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION ~" <br />Date :~\ ~09=d••-s-~~0=-'j/t8lf ~- Permit or job no.: C-1981-012 Site :New Elk Mine <br />User : JHB Abbreviation : none State :Coloraco <br />~\ Filename : C012-00~ County :Las Animas <br />Agency or organization name : Ccolorado Division O(Minerals And Geology <br />Permit or job action :2001 Midterm <br />TASK LIST (DIRECT COSTSI <br />NO. _ TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />Ola -Demolition and disposal of structures demolish 2 100.00 $233,141 <br />01b -Demolition and disposal of structures demolish 2 100.0 $376,144 <br />003 -Seed 89 ac. /aril. area; rangeland mix revege _ <br />1 89.0 $76,480 <br />004 -Seed, mulch, transplant 10.27 ac. ripaarian habitat revege 1 10.5 538,209 <br />005 -Seed, mulch, transplant shrubs on 31.75 acres revege 1 31.7 $173,515 <br />037 -Seed 8 mulch 1.94 acres topsoil borrow area; rangeland mix revege 1 1.9 $1,878 <br />Olc -Demolition and disposal ofstructures and culverts demolish 2 75.0 591,563 <br />01 d -Demolish and dispose of culverts and structures, ' demolish 1 90.0 $58,560 <br />010 -Haul SW coal stockpile footprint tto Bevel. waste pile truckl 1 10.9 $8,593 <br />10a -Haul SE coal stockpile footprint to Bevel. waste pile truckl 1 17.91 510, 705 <br />fOb -Haul NE coal stockpile (ootpdnt to Bevel. waste pile truckl 1 13.5 $8, 261 <br />lOc -Haul raw coal storage footprint to devel..waste pile truckl 1 27.5 $16, 774 <br />10d -Haul clean coal stockpile footprint to deVel. waste pile truckl 1 37.51 525,199 <br />007 -Seal shag Collar and Seals mineseal 1 20.0 512,582 <br />012 -Haul topsoil from entrance stockpile to DWP truckl 1 10.1 $6,039 <br />13a -Haul 8 spread 30,097 cy cover rriaterial from RDA to DWP truckl 1 79.2 $59,395 <br />13b -Rip material for 3.5' cover on 5:33 ac. DWP dozer 4 30.41 $18, 752 <br />002 -Sealdri//holes borehole 1 12.0 $2,857 <br />015 -Rough grade facilities area dozer 4 139.7 $81,524 <br />016 -Rip roads ripper 1 11.7 $1, 766 <br />017 -Finish grade DR areas receiving topsoil grader 7 27.51 52,993 <br />018 -Finish grade refuse pile grader 1 21.8 $2,377 <br /> <br /> <br /> <br />suarorALS 958.3 $1,305,307 <br />' includes inflation /actor adjustment ot: NA % TOTAL DIRECT COST' _~ j1,305,307 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability lDSUranCe: 1.55 %Of direct total= $20,232 <br />Performance bond : 1.05 % of direct total = $13,706 <br />Job superintendent : 479.17 hrs•...$/hr: $33.50 total = $16,052 <br />Profit: 10.00 %ofdi2ct total= $130,531 <br />'assume net Hours = 50% of task Hours TOTAL o a P = $180, 521 <br />1 CONTRACT AMOUNT (direct + o a P) _ $1,485.827 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation : 4.25 % of Intr. NA total = $63.148 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $74.291 <br />coNriNGENCV - NA' NA total = NA <br />' contingencies accoun(ed /wet task level TOTAL INDIRECT COST = $317,960 <br />TOTAL BOND AMOUNT (direct + indirect) _ $1,623,266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.