Laserfiche WebLink
~ ,• • ~ <br />Mining Ce114 Reconfiguration: 3) Appendix I, Pre-Mining Floodway & 100-Year Floodplain HEC-RAS <br />Model Results as prepazed by Weiland Sugnet, Inc. shows a small portion of the Big Thompson River <br />Floodway to occur within the boundaries of Cell 4. This is inconsistent with the intent of the revision <br />request. Please confirm that all mining excavation a[ the Green/Croissan[ Property will occur outside the <br />Floodway as defined by [he HEC-RAS modeling provided in the revision request. <br />The Division appreciates your response to the above concerns on or before January 18, 2002. Please call <br />me at (303) 866-3567 if you have any questions. <br />Sincerely, <br />~I~ <br />Thomas A. Schreiner <br />Environmental Protection Specialist <br />cc: Carl Mount, DMG <br />Mr. Alex Schatz <br />Banks & Gesso, LLC <br />720 Kipling, Suite 117 <br />Lakewood, CO 80215 <br />Attachment <br />