Laserfiche WebLink
ENERGY, INC. <br />A SuAsidiary of <br />Drseret Generation & <br />Transmission Cooperative <br />RE: <br />June 30, 2004 <br />Mr. Jim Stazk <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECE~~ED <br />JUL 01 P004 <br />Givisien of Minerals and Geology <br />Request for extension to addressing Stipulation No. 53 <br />Modifications to Final Reclamation of Refuse Piles 2/3/4 and Sa. <br />Deaz Jim: <br />Blue Mountain Energy, Inc. requests that DMG extend the submittal date for Stipulation <br />No. 53 to July 30, 2004. We finally received the geotechnical stability modeling report <br />and clarifications for the new profile per Section 4.10.4(2) of the regulations. This report <br />was received late in June. We can now complete final design changes to per Stipulation <br />No. 53. The design we will be proposing will be substantively the same as previously <br />discussed with you. <br />Sincerely, <br />-~~_~`~ <br />Scott Wanstedt <br />Environmental Engineer <br />cc: Jeff Dubbert <br />~~.~~~ <br />3607 Cowty RD fF65 <br />Rangely, CO 81648 <br />970.676300 <br />Pax 970-675-0399 <br />