Laserfiche WebLink
oil and gas operations and shall be at least 30 feet in width and built to withstand a minimum of <br />104,000 pounds and 26,000 pounds per axle. KMG agrees to access the Pmperty according to <br />the routes depicted and described on the attached ,~ once the streets are constructed by <br />Surface Owner and Surface Owner provides KMG notice of such but KMG may continue to use <br />its present access routes until that time and until receipt of such notice from Surface Owner. <br />6. BATTERIES AND EQUIPMENT. <br />KMG shall have the right to locate, build, repair and maintain tanks, separators, <br />dehydrators, compressors and other equipment reasonably appropiate `for the operation and <br />production of the Existing Well or any Futwe Wells only within;;=the Oil and Gas Operations <br />Areas. <br />With respect to KMG's equipment and facilities otfier_ tfian flowlines;4r pipelines: <br />a. KMG shall install and maintain, at its sole cost and expense, .all fences <br />azound the Existing Well and any Future"~VVells in compliance with`ti7~e'Rules and <br />Regulations ofthe COGCC; _. ,,, <br />b. KMG shall install,and maintain, at its"sole cost and expense, all gates and <br />locks reasonably necessary for tfieeseewity of any we$s'or facilities in the Oil and Gas <br />Operations Areas. Such gates and flocks shall be the standard' gates and locks used by <br />KMG; <br />- - ~;:_ <br />c. KMG shall paint any pmductton facilities for any wells, including <br />wellhead guazds,wvrth patnkthat is approved by the COGCC; and <br />d. Surface Owner shall not iii}ubit KMG's access to the Oil and Gas <br />Operations Areas or mhtbit; KMfr's. operations within the Oil and Gas Operations Areas <br />..:..:; <br />by landscaputg or other xmprovemeuts,'unless otherwise agreed upon between Surface <br />Owner and KIvIG_ <br />7, . ~ = 1'VO.TICE OF FUTURE OPERATIONS. <br />KMG-=shall provide at-^least seven (7) days prior written notice to Surface Owner of any <br />operations in connection with`the reworking, fracturing, deepening or recompletion operation on <br />the Existing Well 0,r any Future Wells; provided, however, that KMG shall provide at least thirty <br />(30) days prior written-:notice to Swface Owner and/or any homeowner's association formed by <br />Surface Owner that is?associated with the Property upon the drilling of any Futwe Wells. <br />Regardless of the foregoing notice requirements, KMG shall have immediate access to any of its <br />facilities in the event of an emergency. <br />After receipt ~;fthe alx?~'e not?ce. but not less than five: (~) working days prior'o K:MG's <br />rnebilization on t't?e applicable (}ii and Gas C)peratiox!S Areas, caber (iiv9C~ ur Surtace C~wr:.=' <br />may rc~lr:cst an on-site mectinr The piLppSe ofthe meeting shall be to Inform surface Ovrr'?er cf <br />the expecte~t act?vity and [r~ coordie~ate gee access. hazards; barr4cades, restoracirm or any other <br />issue:; that. affect the asc and safety nf~urtace Ownefs development. <br />io <br />