My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06708
DRMS
>
Back File Migration
>
Revision
>
REV06708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:44 AM
Creation date
11/21/2007 9:36:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
9/14/2005
Doc Name
Review/Adequacy Response Memo
From
Janet Binns
To
Byron Walker
Type & Sequence
TR48
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 14-Sep-2005 Permit or job no.: C-1982-056 Site : Foidel Creek Mine <br />User : JHB Abbreviation : none State :Colorado <br /> Filename : C056-000 County : Routt <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or iob action :TR-48 <br />N0. i IST (DIRECT COSTSI TASK DESCRIPTION DOSED SIZET I HOURS I COSTT <br /> Summary of tasks for 6 North Shaft TR-48 <br />801 -Demolition of structures demolish 1 40.0 $36, 030 <br />802 -Seal two 13-inch dia. boreholes borehole 1 15.6 $20,376 <br />803 -Replace topsoil on 6N mains vent shaft pad dozer 1 40.1 $4, 610 <br />804 -Replace topsoil of 6 N shaft pad access road dozer 1 14.6 $1, 683 <br />805 -Regrade 6 North Shaft Access Road dozer 1 5.9 $1,353 <br />806 -Regrade 6 North Shaft Pad dozer 1 7.6 $1,750 <br />807 -Topsoil 6 North Shaft Pad dozer 1 8.7 $1,982 <br />808 -Push cuttings back into shag dozer 1 34.5 $7, 848 <br />809 -Pourcement plugs in shag borehole 1 11.4 $48,533 <br />810 -seed reclaimed 6 North Shag Pad area revege 1 11.0 $6, 779 <br />811 -seed reclaimed 6 North Shaft access road revege 1 2.4 $1,370 <br />812 -regrade 6 North Shaft Pad ditches dozer 1 0.4 $48 <br />813 -Regrade 6 North Shaft Access Road ditches dozer 1 0.7 $84 <br />814 -Mob/demob equipment from Hayden mobilize 1 3.3 $1,808 <br />815 -regrade 6 N shag sediment pond dozer 1 4.3 $526 <br />816 -Remove 8 dispose of gravel from 6 N Mains access road tmckl 1 6.1 $1, 940 <br />suarorALS: 207.0 $136,720 <br />• inUudes inflation faMOr adjustment of : NA % TOTAL DIRECT COST `_ $136,720 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability IRSUranCe : 2.02 %Of dlleCf total = $2, 762 <br />Performance bond : 1.05 % of direct total = $1,436 <br />Job superintendent : 103.53 hrs'...$/hr. $37.50 total = $3,663 <br />Profit : 10.00 % of direct total = $13,672 <br />• assume net hours = 50% of task hours TOTAL O 8 P = $21, 752 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direU+O&P)= $158,472 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $7,924 <br />CONTINGENCY- NA' NA total= NA <br />•conangencies accounted for at task level TOTALINDIRECT COST= $29,675 <br />TOTAL BOND AMOUNT (direct + indirect) _ $166,395 <br />
The URL can be used to link to this page
Your browser does not support the video tag.