My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06708
DRMS
>
Back File Migration
>
Revision
>
REV06708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:44 AM
Creation date
11/21/2007 9:36:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
9/14/2005
Doc Name
Review/Adequacy Response Memo
From
Janet Binns
To
Byron Walker
Type & Sequence
TR48
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) CosVhr/fleet CosVhr/fleet <br />-Generic 12-18 cy, 6x4 $68.99 2 $137.99 $137.99 <br />-Water Tanker, 3,500Ga1. $49.12 1 $49.12 $49.12 <br />-Cube Truck, 4x2, 170 HP $52.83 1 $52.83 $52.83 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Hayden <br />Transportation Cvcle Time : Non- Total one-way travel distance : 12.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.34 0.34 Total non-roadable mob/demob cost' <br />0.34 0.34 ' nvo round trips with haul rig <br />0.50 NA Total roadable mob/demob cost " <br />0.50 NA "one round trip, no haul rig <br />1.69 0.69 <br />$1,642.99 <br />$164.53 <br />JOB TIME AND COST Total job time : 3.37 hours <br />Total job cost : $1,808 <br />
The URL can be used to link to this page
Your browser does not support the video tag.