My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06674
DRMS
>
Back File Migration
>
Revision
>
REV06674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:07:43 AM
Creation date
11/21/2007 9:36:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
11/6/1997
Doc Name
MR 34 MID TERM REVIEW RESPONSE ADEQUACY RESPONSES SOUTHFIELD MINE YOUR FN C-81-014
From
ENERGY FUELS COAL INC
To
DMG
Type & Sequence
MR34
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~ ~II ~I~~II~I~~~II II~ <br />ei~ergy fuels coal, inc <br />~.:: -~ Southfield mine ~=_= =--=-v --: __-_ - ----- --- -- --~ <br />p. o. box 459 1190 county road 92 Oorencq Colorado 8122b phone (719) 784-6395 fax (i 19) 784-4352 <br />November 3, 1997 <br />Ms. Susan L. Burgmaier <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RF_CEIVED <br />NOV 0 6 1991 <br />RE: Minor Revision No. 34 -Mid-Term Review Response <br />Adequacy Responses :;~ivi6ion of ~wnerals 8 Geology <br />Southfield Mine, Your File No. C-81-014 <br />Dear Susan: <br />This letter and its attachments are submitted in response to your minor edits for MR-34 dated <br />October 9, 1997. The following responses are provided according to the item number <br />referenced in the minor revision. <br />2. EFCI placed all the available stockpiled topsoil on the azeas of the loadout reclaimed <br />in 1996. Pending further soil testing and evaluation, EFCI intends to utilize primarily <br />on-site materials for the vegetative growth medium upon final reclamation of the two <br />pond areas. <br />EFCI will prepare and submit a plan demonstrating that a suitable vegetative plant <br />growth medium will be provided to cover the loadout pond azeas. Because of the time <br />required to prepaze this plan, EFCI requests that MR-34 be approved with a <br />stipulation to submit the plan within 180 days of the revision approval date. <br />21. The permit allows EFCI to place live handled topsoil on the refuse pile at a thickness <br />determined by test pit evaluation, or four feet of suitable non-segregated soil recovered <br />from stockpiles. Page 4.06-5 has been revised to reflect these methods. Copies of the <br />revised text pages accompany these responses for replacement in the permit <br />application. <br />Permit materials for this response include text pages. Included with this transmittal aze 3 <br />copies of the following: <br />Summary of Revisions and Additions <br />Revised Permit pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.