Laserfiche WebLink
_~ ; <br />Mountain Coal Company <br />West Elk Mine <br />Post Olfice Box 591 <br />Somerset, Colorado 81434 <br />Telephone 970 929-5015 <br />Fax 970 929-5595 <br />°~~FIVED <br />August 23, 1996 <br />Mr. Michael Boulay <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. CO 30203 <br />AUG 2 6 1896 <br />Olvlcinn Al (~iinora lF 8 GOOIO9Y <br />RE: minor Revisimi No. 194; West Elk Mine; Permit P:o. C-$0-OU'1 <br />Dear Mr. Boulay: <br />~~~ I~~I~~I~~II~~ I~I <br />999 <br />Mountain Coal Company (MCC) requests a minor revision to the West Elk Mine permit to <br />expand rlle parking lot which is located to the east of the breaker building. Please find enclosed a <br />minor revision form. <br />Approximately 4.50 cubic yards of fill material is needed to expand the parking lot. Initially, the <br />source of till material will include about 250 cubic yards from the excavation of the previously <br />used Floor material in the material storage bench building. The remainder of the fill needed to <br />expand the parking lot will come from other sources (not currently known at this time, but would <br />be considered extra fill material) on the mine site. The area to be filled has previously been <br />disturbed and all topsoil has been removed. <br />MCC believes that the additional 450 cubic yards of fill material to be placed to the east ofthe <br />breaker building will not significantly affect the cut and ftll balance in the final reclamation plan; <br />therefore, a bond estimate has not been included. <br />?lease call il' you have any questions. <br /> <br />>`'hristine E. Johnst <br />Permitting Speciali <br />cc: Norm Cvery <br />Kathy Welt <br />nv19J.Juc <br />