My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-10_REVISION - M1997014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997014
>
1999-03-10_REVISION - M1997014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 1:00:32 PM
Creation date
11/21/2007 9:34:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Revision
Doc Date
3/10/1999
Doc Name
DEER CREEK QUARRY PN M-97-014 SUCCESSION APPROVAL RN SO-001
From
DMG
To
CAMAS COLORADO INC
Type & Sequence
SO1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Ill Iillllllllllllll <br /> 999 <br /> 5TATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> D"Pm <br /> •I'1en ofl nl NalU rat Kesources <br /> 111 t Sherman tit_ Room 215 <br /> IJcn\'cr,Colorado 80203 D I V 1 5 1 0 N 0 - <br /> v11„n1: (103)ilb6-3567 M IN E R A L S <br /> FAN:(,03)832-13(06 &— - <br /> GEOLOGY <br /> RECLAMATION <br /> March 10, 1999 MINING-SAFETY <br /> B9)Owens <br /> Mr. Michael C. Refer G .ern,,, <br /> CAMAS Colorado. Inc. Greg E.walchw <br /> 3605 S. Teller St. EKecuhve D,,em, <br /> Lakewood. CO 80235 Michael B.Long <br /> Division Director <br /> Re: Deer Creek Quarry,Permit No. M-97-014,Succession Approval, Revision No.SO-001 <br /> Dear Mr. Refer: <br /> On March 10, 1999, the Division of Minerals and Geology' approved the succession of operators from Deer <br /> Creek Quarry, Inc. to CAMAS Colorado, Inc. for the Deer Creek Quarry, Permit No. M-97-014. CAMAS <br /> Colorado, Inc. is now the permitted operator of the Deer Creek Quarry, and as such, is responsible for all <br /> provisions in Permit No. M-97-014,as well as those specified in the Rules and Regulations. Deer Creek Quarry, <br /> Inc. is relieved of all responsibilities concerning this operation. <br /> Please Note: <br /> 1. All of the application materials,as amended and supplemented,are an integral part of your permit. They <br /> have been incorporated into the permit by reference. We presume that you have a copy of all of these materials: <br /> therefore, none have been enclosed Aith this mailing. We suggest that you keep a copy of the permit and the <br /> permit application at the mining operation as a reference for operating personnel,to help ensure compliance mth <br /> the terms of the permit. <br /> 2. Changes in the mining and reclamation operations that differ from those described in the permit may <br /> require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to <br /> determine if a modification to the permit is necessary. Rule I.10 pertains to Amendments. Rule 1.9 to Technical <br /> Revisions, and Rule 1.11 to Conversions. <br /> 3. On your permit anniversary date(September 12th)each year,you must submit an annual fee($550.00) <br /> and annual report to us. Please consult the Rules,Act, and your permit for specific requirements. <br /> If you have anv questions,contact me. <br /> Sincerely, <br /> 1<l Carl B. Mount <br /> Senior Environmental Protection Specialist <br /> cc: David Hammer, Deer Creek Quam', Inc. <br /> Barbara D. Chiappone, Division of Minerals and Geology <br /> M IOSSZDpTE\U4\ISCV 01a CBM <br />
The URL can be used to link to this page
Your browser does not support the video tag.