My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV06423
DRMS
>
Back File Migration
>
Revision
>
REV06423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:05:13 AM
Creation date
11/21/2007 9:33:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/6/1996
Doc Name
CONDITIONS FOR APPROVAL OF TECHNICAL REVISION TR-020 CRIPPLE CREEK & VICTOR GOLD MINING CO CRESSON P
From
DMG
Type & Sequence
TR22
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - • • iii-iiiiiiiiiiiuiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of NaWral Resources ~~~~ <br />171 3 Sherman SL, Room 21 5 <br />Denver, Colorado 80203 <br />Phone: 1303) A66-3567 <br />FAX. 1303) 832 B 106 <br />DEPARTMENT OF <br />NATURAL <br />DATE: June 6, 1996 RESOURCES <br />Roy Romer <br />Governor <br />TO: Berhan Keffelew <br />James 5. Lochhead <br />Eaecm rve Dueaor <br />FROM: Allen Sorenson Michael B. Long <br />Division DireUOr <br />RE: Conditions for Approval of Technical Revision TR-020, Cripple <br />Creek and victor Gold Miainq Company, Cresson Project, Permit <br />No. M-80-244 <br />The Operator has committed to complete bench scale testing of soil liner <br />fill materials from all approved borrow areas to characterize freeze-thaw <br />effects on the permeability of the compacted soils. If the bench scale <br />testing demonstrates the potential for significant detrimental freeze-thaw <br />effects, the Operator has committed, and is required, to take appropriate <br />measures to ensure that soil liner fill permeability will continue to meet <br />the design specification of 10_6 cm/sec maximum permeability. <br />The Division cautions the Operator that conformance with the design <br />specification of 10_6 cm/sec maximum permeability for soil liner fill must <br />be demonstrated through direct measurement of in-place density and <br />permeability as detailed in the approved construction quality assurance <br />plan. Further, certification of the facility as constructed in accordance <br />with the approved design plan, in accordance with Rule 7.3.2 of the Hard <br />Rock/Metal Mining Rules and Regulations of the Mined Land Reclamation <br />Board, requires direct measurement to support certified verification by <br />the certifying professional. Therefore, because direct measurement will <br />be precluded by subsequent construction, the Division must be satisfied, <br />based on the results of the bench scale testing, that freeze-thaw effects <br />will not cause an increase in soil liner permeability beyond the 10_6 <br />cm/sec limitation subsequent to the direct density testing of the <br />compacted soil liner. In other words, certification that the soil liner <br />conforms with the design specification of 10_g cm/sec maximum permeability <br />may not rely on indirect demonstrations of rehabilitation of the soil <br />liner fill by post placement consolidation. <br />It is important the bench scale freeze-thaw testing of the soil liner <br />materials be completed expeditiously. The Division encourages the <br />Operator to limit soil liner placement to those areas of the Phase II <br />leach facility which will not be exposed to potential freezing subsequent <br />to compaction until after the results of the bench scale testing have <br />been reviewed and accepted by the Division. Candidate areas would include <br />the pregnant solution storage area and any additional areas which will <br />receive ore placement prior to freeze this fall. If any of the proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.