Laserfiche WebLink
4 <br />I. PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br />Colorado Yampa Coal Company applied for partial bond release under the Colorado <br />Surface Coal Mining and Reclamation Act following reclamation of the Eckman Pazk <br />Mine. The mine is located in Routt County, approximately 22 Southwest of Steamboat, <br />Colorado. The mine azea is located in: <br />Township 5 North, Range 86 West of the 6th P.M. <br />Section 19: S''/z, S'/zN'/z <br />Section 20: S''/z <br />Section 28: SW%SW'/. (bounded by Routt County Road No. 27) <br />Section 29: W%zSE'/., that portion of the E'/zSE'/. south of RCR 27, S E % S W '/< , <br />Section 30: NW'/., NW'/.NW'/,NE'/,, SW'/SW'/,. <br />Section 31: S%z, S'h%z, NW'/~NW%, NE'/,NE'h <br />Section 32: W%:, NE'/. <br />Section 33: NE%, (bounded by RCR 27), NW'/., SE'/,, E'/zSW'/. <br />Section 34: W%zSW'/. <br />Township 5 North, Range 87 West of the 6th P.M. <br />Section 24: S%zS%:SE'/., E%ZE'/zSE'/, <br />Section 25: E''/z, E%zW'/z <br />Section 36: NE'/.NE'/,NE'/. <br />Bond Release History <br />Since the issuance of the State of Colorado permit, the following bond release actions <br />have occurred . The first was approved June 2, 1982, which entailed the complete release <br />of 233.10 acres located in the southwest 1/4, southwest 1/4 of Section 19, and the west <br />1/2 of Section 30, all in Township 5 North, Range 86 West, 6th P.M. '~ <br />The second release became final October 10, 1987. This release was a Phase I bond <br />release involving 2,397.9 acres. The specific locations are referenced in detail within the <br />permit documents. The 1987 Phase I bond release reduced the required bond amount for <br />permit no. C-81-071 by $1,705,393, from $10,585,393 to 8,880,000. <br />Four Phase I[/III bond release applications have been filed by CYCC as of December 6, <br />1996. Block A (SL-O1) was deemed complete on December 15, 1992 and was denied on <br />July 18, 1994. Blocks B, C, and D (SL-02, SL-03, and SL-04 respectively) were deemed <br />complete on December 14, 1993. Block B, SL-02, was denied on June 8, ]995. Block <br />D, SL-04, was denied on June 8, 1995. <br />