Laserfiche WebLink
M <br /> <br />Addendum to Geotechnical Data Report <br />Bowie Resources, Limited <br />July 2002 <br />TABLE 5.1 <br />MAIN DAM AND SADDLE DAM GROUNDWATER LEVELS <br />ON MAY 7, 2002 <br /> <br />Boring <br />No. <br /> <br />Location i'i Depth to <br />Water <br />(FT) Piezometer <br />Installation <br />(Zone of Influence) <br /> <br />Subsurtace Material <br />MAlN DAM <br />BD-101 Left Abutment N/A 11.0 - 20.0 feet New Embankment <br />BD-103 Center D/S <br />Toe 33.7 37.0 - 53.0 feet Foundation Soils <br />BD-105 Center Crest 84.4 72.0 -113.5 feet Foundation Soils <br />BD- <br />105A Center Crest 29.4 26.0 - 40.0 feet New Embankment and <br />Old Embankment <br />SADDLE DAM <br />BS-102 Center Crest 6.2 21.5 - 43.0 feet New Embankment and <br />Bedrock <br />Note: <br />{1) Locations described based on view looking downstream (D/S). <br />GEI Consultants, Inc. <br />t2 9949102-0]~3 AdCerq~m GeofeUini~al Oete Rpt <br />