Laserfiche WebLink
Rule 2.07 <br />5. Stipulation No. 9, as originally written for the D coal seam mine plan, required that <br />appropriate seismic studies be performed before there was mining within one mile of the <br />Bruce Park Dam. Later, in Permit Revision No. 8, Stipulation No. 9 was modified for the <br />B coal seam mine plan to state that the appropriate seismic studies be conducted before <br />the angle of draw from mining the B coal seam came within one mile of the Bruce Pazk <br />Dam. It is not clear from the proposed Map 27, "Subsidence", if the angle of draw from <br />the mining of the B coal seam will be at least one mile from the Bruce Pazk Dam. Under <br />Rule 2.07.7(3), please indicate, either on Map 27 or perhaps with a new cross section on <br />Map 27A, that the proposed B coal seam mine plan will comply with Stipulation No. 9. <br />Rule 2.10 <br />Please update the appropriate permit maps to show the new permit boundary, as required <br />in Rule 2.10.1(3). <br />Rules 2.05 and 2.10 <br />7. The access agreement with Brian (William) Hughes refers to the owner's cabin, waterline <br />and other related facilities. The Division has several comments related to these facilities: <br />A. As required in Rule 2.10.3(])(d), please revise Map 27 to show the location of <br />these structures. <br />B. Under Rule 2.05.6(6)(a), please update the permit text in Section 2.05.6(6) to <br />include these structures. <br />C. Per Rule 2.05.6(3), if there is a water right associated with the water facilities for <br />the Hughes cabin, please update Section 2.05.6(3), including the probable <br />hydrologic consequences discussion, and revise Map 23 appropriately. <br />D. Depending on the location of these structures in relation to the mine plan, the <br />permit text may need to be modified to update the discussion of subsidence (Rule <br />2.05.6(6) and hydrologic consequences (Rule 2.05.6(3). There also could be the <br />possibility of additional subsidence monitoring, under Rule 2.05.6(6)(c), and <br />additional hydrologic monitoring, under Rule 2.05.6(3)(b)(iv). <br />Rules 2.04 and 2.05 <br />8. Because PR-9 proposes changes to the aerial extent ofthe B-seam mine plan and because there <br />has been additional hydrologic information obtained by BRL, the Division has the following <br />questions: <br />2 <br />