My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05969
DRMS
>
Back File Migration
>
Revision
>
REV05969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:40 AM
Creation date
11/21/2007 9:30:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Revision
Doc Date
7/9/1986
Doc Name
VALCO/PUEBLO CONCRETE DIV PUEBLO WEST PIT AMENDMENT FN M-77-573
From
VALCO
To
MLR
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L•'}iHIBI7' I/J (Cont'd) <br />• • <br />I <br />I <br />to cover the area to a depth of at least 6 inches. The site should be smoothed, <br />and grass drilled to a depth of 1/2 to 3/4 inch. A spring planting, between <br />March 15 and May 1 is recommended. However, if this is not possible, planting <br />can be done anytime during the growing season. The seeded area should be <br />covered with a mulch of straw or native hay, at the rate of ~,OUO pounds per <br />acre. The mulch should be crimped in by use of a crimper, ar a disc sritt~ discs <br />turned straight. The following mixture is recommended: <br />• Western wheatgrass 5.5 lbs pure live seed per acre <br />Fairway crested wheatgrass 3 Lbs pure Live seed per acre <br />Yellow aweetclover 1 16 pure live seed per acre <br />If no drill is available, seed may be broadcast and covered by harrowing. When <br />shed is broadcast, the seeding rate given should be doubled. <br />Supplemental water should be applied by sprinkler. Approximately 1/4 inch- <br />of water should be applied every 1 to 4 days for 6 co 8 weeks. If precipitation <br />occurs during this period, the mnount of water applied by sprinkler can be reduced. <br />If the areas along tt~e breaks are mined for gravel, they will be reclaimed <br />by leveling to provide building.sitea. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.