Laserfiche WebLink
<br /> <br />Colowyo submitted results of a revised hydrology model for the <br />Prospect Pond and Ditch by the December 14, 1992 date requested by the <br />Division. (Acceptable certified as-builts for the pond and ditch were <br />submitted at the same time.) Page 4.05-2A of the permit can be <br />deleted from the permit when the Division and Colowyo reach final <br />agreement on the hydrology for the Prospect Pond. The Division <br />encourages Colowyo to submit a revised hydrology model for the West <br />Pit Drainage soon after initial discussions between Colowyo and the <br />Division over possible worse case scenarios, to allow sufficient time <br />for review prior to any on ground disturbance in that watershed. <br />Thank you for your cooperation in these matters. Please feel free to <br />contact me after January 25, 1992 or Larry Routten in my absence. <br />Sincerely, <br />Stephen F. Wathen <br />Reclamation Specialist <br />M:\COAL\COLOWYO\MRAPPROV.22 <br />