My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05921
DRMS
>
Back File Migration
>
Revision
>
REV05921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:36 AM
Creation date
11/21/2007 9:29:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Revision
Doc Date
11/2/1993
Doc Name
completeness letter
From
DMG
To
LANDMARK RECLAMATION INC
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: (3031 866-3567 <br />FAX: (3031 83 2-0106 <br />November 2, 1993 <br />Mr. Mark Kerr <br />Landmark Reclamation, Inc. <br />4901 South Windermere Street <br />Littleton, CO 80120 <br />of cow <br />tip. <br />Nc ~~ <br />•~~ <br />~B ]6 ~ <br />Roy Rnmer <br />Governor <br />Michael B. Long <br />Division Director <br />RE: Request for Phase I Bond Release, Landmark Reclamation, Inc., <br />Rimrock Strip Mine, Permit No. C-89-074 <br />Dear Mr. Kerr: <br />The Division has found your application for Phase I Bond Release <br />for the Rimrock Strip Mine complete for the purposes of filing. <br />Rule 3.03.2(2) states that an inspection be conducted within <br />30 days of receipt of a complete bond release application. The <br />Division has scheduled an inspection for 8:00 a.m. on Friday, <br />November 12, 1993. <br />Individuals from the Division who will be conducting the <br />inspection will include Dan Hernandez and myself. The Albuquerque <br />OSM Office may also be present. You, of course, are welcome to <br />accompany us if you so desire. <br />The public, per Rule 3.03.2(3), has 30 days from either the last <br />publication of the notice required by Rule 3.03.2(1)(b), or the <br />Division's inspection, whichever is later, to request an informal <br />conference. Informal conferences regarding bond release are <br />described in Rule 3.03.2(4). <br />If no informal conference has been requested, then the Division, <br />per Rule 3.03.2(5)(a), will provide all required parties written <br />notification of the proposed decision. Per Rule 3.03.2(5)(a), <br />interested parties will have 30 days from either the inspection, <br />or the first publication of the Division's proposed decision, <br />whichever is later, to request a public hearing per Rule <br />3.03.2(6). <br />Per Rule 3.03.2(5)(C), if no request for hearing is received <br />within the 30 day period from the inspection or the first <br />publication of the Division's proposed decision, the proposed <br />decision of the Division shall be final. <br />
The URL can be used to link to this page
Your browser does not support the video tag.