Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Eqp. <br />Cost/hr <br /> <br />Fleet Size Hau( Trip <br />(no. hauled) Cost/hr <br />xaut truck, 10 cu yd copy. <br />510,00 <br />1 510.00 <br />________________ <br />Subtotals E10.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />___________________________ <br />Nan-Roadable Eqp. Description <br />Weight Ownership Haul Rig Fleet Size Haul Trip <br />(tons) Cost/hr Cost/hr (no. hauled) Cost/hr <br />sheet 2 of 2 <br />turn Trip <br />Cost/hr <br />E10.00 <br />510.00 <br />Trip DOT Permit <br />hr Cost/ea <br />Subtotals 50.00 E0.00 <br />_________ ________ <br />Total Eqp. Fleet Size Haul Trip R turn Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cast/hr <br />Subtotals E0.00 E0.00 <br />EQUIPMENT NAUL DISTANCE & TIME <br />______________________________ <br />______________________________ <br />Nearest major city or town <br />within project <br />area region: Gunnison, CO <br />Total one way travel distance = 10.0 miles . Average travel speed = <br />Job Time - Non Roadable Equip. = 1.00 hours load Roadable Equip.= <br /> 0.25 hours haul <br /> 1.00 hours unload <br /> 0.25 hours return <br />40.00 mph. <br />NJA hours load <br />0.25 hours haul <br />N/A hours unload <br />0.25 hours return <br />JOB COST Total Mob/Demob Cost = 52,380.96 <br />i <br />NOTE: Non-roadable equi Anent (haul rig required to transport) mob/demob costs based on 2 rou trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (n haul rig required) <br />costs based on one round Trip. Colorado DOT requires special permits for oversize equipment an certain <br />specified road segments within the State. Separate permits are required for each rig n each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equi Anent hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and reassembled at the job site. Costs for liftin equi Anent and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />E0.00 <br />