Laserfiche WebLink
• <br />KIRKLAND CONSTRUCTION t.t.t..p <br />P.O. Box 580 Rye, Colorado 81069 <br />719 / 489-3385 <br />FAX 719 / 489-2265 <br />Fqud Opportunity Employer <br />May 4, 2000 <br />Mr. Larry D. Oehler <br />Environmental Protection Specialist <br />Division of Minerals Geology <br />1313 Sherman St., Room 2l5 <br />Denver, Colorado 80203 <br />~~ ~ 8 2000 <br />r~'hsion ofhfinerals& Geology <br />RE: Adequacy Review, Technical Revision No. 2, Two Rivers Pit. <br />Permit No. M-1998-038 <br />Dear Larry Oehler: <br />This is in response to your letter of April 20, 2000 regarding our Technical Revision for <br />Two Rivers Pit, Permit No. M-98-038. <br />We had previously considered the areas described under the original phasing plan to be <br />quality-mining material. Upon further investigation that material was discovered not to <br />be adequate for our current purposes. Simultaneously, more adequate material was found <br />in the area described under the new phasing plan. <br />The attached phase plan describes the phasing revision to include a portion of the area <br />previously described as phase 2 as a part of the phase 1 mining operation. <br />,S 6 <br />Enclosed please find a rider for additional financial warranty of $3090.00. <br />Sincerely, <br />Joe C". B-axter <br />JCB/crl <br />~ III IIIIIIIIIIIIIIII <br />5/4/00 l 1:28 AM 1 S:\Two Rivers\Permit Rev 2.doc <br />