Laserfiche WebLink
<br />Stipulation 5 <br />ROCKCASTLE <br />CONTOUR AT <br />DECISION TO <br />AS-BUILTS 0 <br />TOPOGRAPHY, <br />POST-MINING <br />RULES 4.14. <br />Stipulation 5 <br />.._„CI'~.b Lr, ice, -C] <br />TECHNICAL REVISION 4, N,ID-TEPJ4 RE'1IEi:, <br />STIPULATIOtJS TO THE DECISION <br />COAL COMPANY SHALL SUBMIT AN ASSFSSh1ENT OF APPROXIMATE ORIGItJAL <br />PITS 5 AND 6 TO THE DIVISION WITHIN SIXTY (60) DAYS OF THE FINAL <br />APPROVE TECHNICAL REVISIOt NUMBER 4. THIS SHALL INCLUDE CERTIFIED <br />F THE POST-MINING TOPOGRAPHY, A COMPARISON WITH PREMINING <br />AfID A DISCUSSION OF EROSIONAL STABILITY, COMPATIBILITY WITH THE <br />LAND USE, AND INTEGRATION WITH THE LOCAL TOPOGRAPHY PER <br />2(1) AtJD 4.27.3(3). <br />ROCKCASTLE COAL COMPANY SHALL AT A MINIMUM SUBMIT EITHER 1) ACCEPTABLE DITCH <br />CALCULATIONS FOR PITS 2 AND 3 OR 2) A COMPLETE BOND RELEASE PACKAGE FOR <br />PHASE I AND II BOND RELEASE FDR PITS 2 AND 3, WITHIN SIXTY (60) DAYS OF THE <br />FINAL DECISION TO APPROVE TECHNICAL REVISION NUMBER 4. THE BOND RELEASE <br />PACKAGE MAY ALSO ItJCLUDE A BOND RELEASE REQUEST FOR PITS 1, 5 AND o. <br />Stipulation 7 <br />ROCKCASTLE COAL COMPANY SHALL INCREASE THE BOND TO $5%2,000 WITHIN SIXTY (00) <br />DAYS OF THE FINAL DECISION 70 APPROVE TECHNICAL REVISION NUMBER 4, TO COYER <br />ANTICIPATED RECLAMATION COSTS A7 THE GRASSY GAP MIIJE. <br />/bdo <br />2I59F <br />