My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05858
DRMS
>
Back File Migration
>
Revision
>
REV05858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:31 AM
Creation date
11/21/2007 9:29:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
12/18/1989
Doc Name
BOARD ORDER MID TERM REVIEW GRASSY GAP MINE FN C-81-039 TR-04
From
MLRD
To
PARCEL MAURO HULTIN AND SPAANSTRA PC
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. On December 8, 19d9, Rockcastle Coal Company, through counsel Dean Hassey, <br />accepted the reclamation bond amount of 5572,000 for the Grassy Gao.Mine. In <br />addition, Mr. Massey withdrew Rockcastle's objection to the remaining two <br />stipulations and agreed to pursue resolution of the two remaining stipulations <br />within sixty (60) nays. <br />7. The Mined Land Reclamation Division finds the Grassy Gap Mine to be in <br />compliance with the applicable regulations specified by law, as demonstrated by <br />the finaings document and on-site inspections. <br />B. The proposed decision of the Division is fully supported by the record and <br />affirmed by the Board, subject to the stipulations recited herein, <br />Decision <br />Upon formal motion and by unanimous vote, the Board hereby affirms the Decision to <br />approve the technical revision for the Mid-Term for Rockcastle Coal Company's Grassy <br />Gap Mine, witn the following modifications to the Stipulations. <br />Stipulation 5 <br />Modify "BY SEPTEMBER 15, 1989." to "WITHIN SIXTY (60) DAYS OF THE FINAL <br />DECISION TO APPROVE TECHNICAL REVISION NUMBER 4." <br />Stipulation 6 <br />Modify "BY SEPTEMBER 15, 1969" to "WITHIN SIXTY (60) DAYS OF THE FINAL DECISION <br />70 APPROVE TECHNICAL REVISION NUMBER 4." <br />Stipulation 7 <br />Modify "5748,767" to ":572,000" <br />Modify "WITHIN (30) DAYS OF 7HE DIVISION'S DECISION" to "WITHIN SIXTY (60) DAYS <br />OF THE FItJAL DECISION TO APPROVE TECHNICAL REVISION NUt•1BER 4." <br />The Board's decision is based on a finding that the proposed operation will comply <br />with all of the applicable reouirements of the Colorado Surface Coal Mining <br />Reclamation act, C.R.S. 1973, 34-33-101 et seq. and the Rules promulgated <br />thereuneer. This permit will not become of ective until the applicant has filed a <br />performance bond with the Division and the Division has approved the bond. <br />Dated and Effective this 14 day of December, 1989. <br />t•1ItJED LAtJD REC1At•1A7IDN BOARD <br />.,. <br />Terrance%ee 0 Connor, ~nairperson <br />L/ <br />/b do <br />2i=~= <br />
The URL can be used to link to this page
Your browser does not support the video tag.