Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />July 26, 2006 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JUL 2 8 2006 <br />Division of klinerals d Geology <br />J. J. Dudash <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 _ <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No 1 Mine " - <br />Technical Revision No. 47 <br />Revised Reclamation Schedule and Ownership and Control <br />Adequacy Response No. 2 <br />Permit No. C-81-038 <br />Dear Mr. Dudash: <br />The DMG's letter dated April 3, 2006, transmitted its adequacy review for the <br />referenced technical revision. On behalf of Bowie Resources, LLC, following are its <br />responses to the DMG's comments and concerns: <br />1. No response required. <br />2. The reclamation schedule for the structures at the unit train loadout was moved <br />to the current year through the first quarter of 2007. BRL intends to crush the <br />concrete from the silos and other structures. The crushed product will be <br />stockpiled on site for future use. This commitment to crush and use the concrete <br />should reduce the bond amount by about $70,000. <br />3. See item 2. <br />4. No response required. <br />5. I did not receive the reclamation estimate. Please at least provide the summary <br />pages. <br />Amended Figure 2.05-5 is enclosed. Please call if you have any questions. <br />,Sincerely, <br />'J. E. Stover, P. E. <br />Consulting Engineer <br />