My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05698
DRMS
>
Back File Migration
>
Revision
>
REV05698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:18 AM
Creation date
11/21/2007 9:27:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Name
FAX COVER
From
DOW
To
LARRY OEHLER
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOW COLD SPRINGS TEL 719-473-4060 May 23.90 11:47 No.006 P.02 <br />• • <br />recirculation ponds and plans for upgradi g existing <br />impoundments, 3) intended use of the 5 dams shown in Plate 4, <br />~ ,. and a) add a surface water diversion for the nort west corner <br />of the permit area. <br />~: <br /> <br />Please see the discussion provided in Exhibit D, under the new <br />heading entitled "Sediment and Drainage Controls". <br />prevention of Discharge/Flood Protection <br />12. <br />The application has pzoposed a minimum setback di tance of 50 <br />feet from the South Platte River. The Division as several <br />concerns regarding demonstration of compliance wit applicable <br />State and Federal Regulations, particularly the lean Water <br />ACt. <br />The Clean Water Act requires that berms, pond wal s, ditches, <br />low dams and similar water retention structures be onstructed <br />in a manner such that they are reasonably expect to reject <br />the passage of water. <br />In order to demonstrate compliance with the Clea Water Act, <br />we suggest that Reclamation Resources Choose ne of the <br />following options: <br />Option 1 <br />X <br />Define the 25-year floodplain for the Middle Fork ~ <br />Platte River. Commit to restricting all mining <br />outside of the 25-year floodplain. Since the <br />life-of-mine for the Alma Placer is ten years, t <br />has deemed the 25 year-24 hour storm as an approps <br />criteria. _~ ~f~~_ <br />option 2 w'~ ~~ '"'~~~ ~"T"^ <br />~~~~ - ~A~~~ ~ D/A.~rlart Gt4~ <br />Commit to construction of a berm along the west <br />operation which will be of adequate size to reje <br />of a 25 year-24 hour storm for the Middle Fark o <br />Platte River. Provide a berm design which include <br />freeboard of 1 foot above the water surface eleva <br />25 year-24 hour storm. <br />if Option 2 is chosen, the following <br />submitted: <br />a. An estimate of the 25-year peak flow discha <br />b. The elevation of the river water surface at <br />flow condition in relation to the berm. <br />c. A description of berm re-enforcement measure <br />riprap and riprap size to insure channel stabs <br />year flow conditions; <br />f the South <br />operations <br />anticipated <br />ie Division <br />Late design ~/"-~~~ <br />side of the <br />:t the flow <br />the South <br />s a minimum <br />:ion of the <br />should be <br />e; <br />he 25-year <br />s, such as <br />sty at 25- <br />
The URL can be used to link to this page
Your browser does not support the video tag.