Laserfiche WebLink
Page 1 of 1 <br />Walker, Byron <br />From: Walker, Byron <br />Sent: Friday, December O8, 2006 1:21 PM <br />To: Jerry M. Nettleton (jnettleton@peabodyenergy.com) <br />Subyect: PR 7 Adequacy, page 2.03-12 and materials not received <br />Dear Mr. Nettleton, please submit a revised page 2.03-12 of the Permit Application Package that reFlects the <br />information sent to Johanna Crammer of the Division of Reclamation, Mining and Safety (Division) for the <br />Applicant Violator System checks. Pages for insertion into Exhibit 47 should be numbered and dated. Please <br />advise of the relationship of these identities to Peabody Holding Company, Inc., and if the list of issued/expired <br />mining permits (04/21/2004) is current or needs to be revised in the permit revision. In addition, the Division is not <br />in receipt, as of the time and date of this message, revised maps 1, 2, 23 and 23B and page 2.03-20. The <br />proposed decision date for Permit Revision 7 is currently December 13, 2006. Please request an extension to <br />allow ten days after receipt (at the Division) of revised materials for review and processing of information into the <br />decision documentation. Please contact me if you have any questions. Yours truly, Byron G. Walker, EPS <br />12/8/2006 <br />