My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05633
DRMS
>
Back File Migration
>
Revision
>
REV05633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:13 AM
Creation date
11/21/2007 9:27:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
9/11/1989
Doc Name
NEW ELK MINE PERMIT C-81-012 TR FOR COAL HANDLING FACILITIES MODIFICATION
From
WYOMING FUEL CO
To
MLR
Type & Sequence
TR16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />UJ~oming Fuel Compon~ <br />Golden Eagle /New Elk Mines <br />10250 Highway 12 • Weston, Colorado 81091 • Telephone (719) 868-2761 <br />September 9, 1989 <br />Mr. James Stevens ~`~ ~ ~ ~~~~x <br />Reclamation Specialist NED~.ANG <br />Colorado Mined Land Reclamation REF~L iJ~ <br />1313 Sherman Street <br />Denver, Colorado 80203-2273 <br />Re: New Elk Mine, Permit C-81-012, Technical Revision for Coal <br />Handling Facilities Modification <br />Dear Mr. Stevens: <br />Wyoming Fuel Company (WFC) has determined that the application for <br />revised coal handling facilities at New Elk Mine should be revised. <br />The "spec coal conveyor", as proposed in the August 18 application <br />for a technical revision, must be realigned to terminate at the <br />clean coal stockpile (on top of the stacking tube) rather than <br />discharging onto the clean coal conveyor. This results from a <br />determination that the clean coal conveyor is inadequate to <br />transport the coal from both the relocated stockpile conveyor and <br />the preparation plant. Pursuant to our discussions, three copies <br />of revised Minproc Engineers drawing No. 713-00/G-101 depicting <br />the new alignment are enclosed. <br />The spec coal conveyor, as realigned, will be 42 inches wide and <br />460 feet long, 65 feet longer than previously proposed. Two <br />additional intermediate supports will be required. This will <br />increase the bond requirements $936 for conveyor removal and $384 <br />for removal of an additional eight yards of concrete in the <br />footings. The total bond required becomes $34,796. <br />Questions on this revision should be addressed to me. <br />Sincerely, <br />C~~~/-~`~e- <br />Carl W. Winters <br />Manager of Engineering <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.