Laserfiche WebLink
,. -,. <br />FLATBED TRUCZ COST DATA YOR[SHEET cant'd <br />OPERATOR YA6ES <br />Labor Classification Zone Designation <br />fbtlti-purpose Truck Driver Zone I <br />Zone 2 <br />Mechanic Zane 1 <br />Zone 2 <br />ACQUISITION COST: <br />Base purchase price (CEC61 <br />Less dealer discount (CEC6 ! 2.2Z) <br />Plus freight (assuce 1.SZ) <br />Plus dealer charges (assuce _3Z) <br />Adjusted purchase price <br />Plus tares: State sales ! 3Z <br />~ ! 2z <br />Less tire cost (CEC6) <br />Less salvage value IcEC& ! 15Z) <br />NET ACQUISITION COST <br />COST SUMMARY : <br />Ownership Cost/Hr: <br />Operating-Overhaul Cost/Hr: <br />Operator Cost/Hr: <br />TOTAL COST/NR <br />Sheet 2 of 2 sheets <br /> <br /> fringe F_I_C_A Imenpl_ Yk.Cap. <br />Base Rate Benefits (0.0170) (0.062) (0.125) Total ~ Shift Differential if/hr) <br /> <br />(13.54 (3.49 f1.04 (0.84 11.69 f2Q.60 . Day shift: (0.00 <br />114.04 (3.49 SI.OS (0.87 fl _76 (21.24 ~ Swing shift: 10.30 <br /> 6raveYard shift: (0.45 <br /> ' ---- <br />(15.22 13.49 11.11 10.94 fl_90 (22.13 ~ 2 shift/date avg_ (0.15 <br />115.72 (3.49 (1.21 10.97 11.97 123.36 ~ 3 shift(daY avg. (0.25 <br />132,065.E <br />(705.43 <br />(480.97 <br />(96.20 <br />(31,936.74 <br />(956.10 <br />1638.73 <br />51,859.77 <br />~.~ 54,790.51 <br />(26,883.30 <br />SINGLE SHIFT DOUBLE SHIFT <br />BASIS BAS IS <br />Zone 1 Zone 2 Zone 1 Zone 2 <br />15,73 15.13 13.78 (3.78 <br />17.46 (7.50 17.46 (7.50 <br />528.68 (21.24 (20.75 (21.39 <br />(33.80 (34.41 (31.99 132.66 <br />7RIPLE ~IIFT <br />BASIS <br />Zane 1 Zone 2 <br />(3.13 (3,13 <br />17.46 (7.50 <br />120.85 121.49 <br />131.44 (32.11 <br />