Laserfiche WebLink
• ~ ~ III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources I~~~~ <br />1313 Sherman SI.. Roam 215 <br />Denver, Colorado 80203 <br />Phone. IIOlI Nb6-3567 <br />FA%~. (3031832-8106 <br />DEF'ARTIv1ENT OF <br />April 10, 1997 NATURAL <br />RESOURCE <br />Scott Davis Roy Rumer <br />Centennial Materials Inc. <br />Governor <br />c/o Schmidt Construction lames S Lochhead <br />E+ecmrve Duector <br />2635 Delta Drive M~cnael a Lonp <br />Colorado Springs, CO 80910 Drv~sion D~reaor <br />RE: Menzer Quarry, Amendment Approval, Permit No. M-76-009-HR, Revision No. <br />AM-3 <br />Deaz Mr. Davis: <br />On April 3, 1997 the Division of Minerals and Geology approved the Amendment application <br />submitted to the Division on December 2, 1996, addressing the following: <br />Add 116.5 acres to the permit area, increase the affected land area by 85.` acres, correct <br />the legal description, improve [he reclamation plan. <br />With the following 3 commitments by Centennial Materials Inc., the terms of the Amendment <br />No. 3 approved by the Division are hereby incorporated into Permit No. M-76-009 HR. All other <br />conditions and requirements of Permit No. M-76-009-HR remain in full force and effect. <br />1. Detention sediment basin No. l is critical to all stages of both Phases 1 and 2. <br />Construction will be coordinated to be an early step in the initial stage of Phase <br />1. Construction of this detention/sediment basin can only occur ;tfter the south <br />quarry wall is mined back far enough and the crusher fines stockpile is moved to <br />the north side of [he quarry floor, making room for the bash.. Centennial <br />Materials will notify the Division when theses two items have been completed. <br />Construction of the basin will be completed within 120 days after [lte notification. <br />2. The final designs and specifications for the stotmwater management facilities on <br />the quarry boor will be submitted to the Division at least 60 da~~s prior to the <br />proposed date for start of construction of each facility. <br />3. The revegatation growth medium, will be a blend of waste rock, fines from the <br />crushing operation and salvaged soil. Testing of various blends of Ihese materials <br />will be conducted to determine the best growth medium. A plan for testing to <br />determine the most suitable growth medium will be submitted to the Division <br />within 120 days of the approval date of [his amendment. <br />