Laserfiche WebLink
EXHBIT D <br />Reclamation Pian <br />The reclamation at the Schuler Terracing Company Gravel Pit Site will proceed as <br />follows: <br />1. The final slopes developed during excavation will be less then 3:1 <br />2. The stockpiled topsoil will be redistributed in even layers over the appropriate <br />portion of the site being reclaimed <br />3. All disturbed areas in this portion of the site will be reseeded for range land use as <br />per recommendations of the Double EL SCD. <br />4. There are no ponds or streams disturbed or created. <br />5. All waste rock that has been stockpiled will be disposed of. Please note that there <br />is not any waste rock anticipated. <br />