My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05546
DRMS
>
Back File Migration
>
Revision
>
REV05546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:07 AM
Creation date
11/21/2007 9:26:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/21/1997
Doc Name
LOCATION DEPTH & DESIGN OF WEST PIT PIEZOMETERS TR18 SAN LUIS PROJECT PN M-88-112
From
DMG
To
BMRI
Type & Sequence
TR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiniii iii • <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />I } 14 Sherman 51., Room Z I S <br />Denver, ColoraAo 80201 <br />Nhunc: (3031 AhbJ56: <br />FA%~. 1}011 A3'?-81 U6 <br />Ron Zumwalt <br />Battle Mountain Resources Inc <br />PO Box 310 <br />San Luis CO 81152 <br />STATE ~ COLO[ZADO <br />Re: Location, Depth and Design of West Pit Piezometers, TR-l8, San Luis Project, M~88-112 <br />Dear Mr Zumwalt: <br />~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Ruy Romer <br />Gmernnr <br />lames 5. Lochhead <br />EKeiulive Director <br />Michael B. Long <br />~wision Orreaor <br />The Division received and reviewed the submittal from Halepaska and Associates regrading the location, <br />the proposed drilling depth and the construction details of the two West pit piezometers which are <br />required pursuant to TR-18. In addition, the locations were reviewed during the October 17, 1997 <br />inspection. <br />The Division hereby approves the location, drilling depth and construction details of the two West pit <br />piezometers (verbal approval was given to BMRI on October 17, 1997 during a rou[ine inspection). <br />As required by TR-I8, the piezometers will be checked monthly to record depth to water so that <br />recharge of the West pit aquifer can be monitored. Reports will be sent to the Division every month. <br />If you have any questions, please give me a call. <br />Sincerely, <br />~`~ ~ ~ <br />James Dillie <br />Environmental Protection Specialist <br />~d " }(-4~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.