Laserfiche WebLink
Delta Sand end Grave. • <br />PIT #1 Amendment <br />M.L.R.B. A' M-77-020 <br />July 74, 7997 <br />Exhibit M -Other permit and licenses <br />1. we have an Air Pollution Emissions Permit for this <br />operation. <br />2. we have a NPDES permit for dewatering the existing lake that <br />will cover the western parcel. No permit is necessary for <br />dewatering the eastern parcel since the water will be pumped <br />into the existing lake and allowed to filter back into the <br />water table. <br />3. Our Storm Water Management Plan (SWMP) will be expanded to <br />cover the new areas added to the operation and will be <br />available for review at the offices of the Corporation or at <br />the pit. <br />4. We do not need a 404 permit for the facility. <br />15 <br />