My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV05488
DRMS
>
Back File Migration
>
Revision
>
REV05488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:04:03 AM
Creation date
11/21/2007 9:25:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979103
IBM Index Class Name
Revision
Doc Date
6/16/1997
Doc Name
TR PERMIT PN 79-103 AMICK PIT RIO BLANCO COUNTY COLO
From
FRANK G COOLEY
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FROM~FRRNK G COOLEY <br />~.. <br />• TO ~ 303 832 8106 ~N 13. 1997 5 ~ III III'IIIII"II'll <br />999 <br />FRANK G. COOLEY <br />A'In'ORNEY AT LAW <br />PROFESSIONAL CORPORATION <br />P.O. Box 98 <br />MEEKER, CO $ 164 I -0098 <br />970-678-5065 <br />e.. e~o-e~o-seoo <br />RECEIVED <br />JUN 161997 <br />Division OI Mlnnraio ~ ©ooiagr <br />June 13, ] 997 <br />State of Colorado <br />Department of Natural Resources <br />Division of Minerals and Geology <br />1313 Sherman Street, Suite 215 <br />Denver, CO 80203 <br />Attention: Mr. Carl Mount <br />Senior Environmental <br />Protection Specialist <br />Re: Technical Revision Permit <br />Permit No. 79-103, Amick Pit <br />Rio Blanco County, Colorado <br />Gentlei.xen: <br />This letter constitutes a request for technical revision of <br />Mining and Reclamation Permit 79-103 for the Amick Pit in Rio Blanco <br />County, Colorado. <br />The address of the local office is changed to P. O. Box ] OS6, <br />Meeker, CO 81641, Telephone Number is 970-878-5371. The named <br />contact person is Darryl Stout. <br />The purpose of this technical revision is to increase the use of <br />the open pit to cover ahot-mix asphalt plant. <br />A. The use will be to operate shot-mix plant for highway <br />constrt.lction materials to be made within the pit. <br />B. The hot-mix plant will take a set up period of not to exceed <br />two weeks and will be in operation for not to exceed thirty days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.