Laserfiche WebLink
Section Topic <br />2.06.7(5) Reclamation delay at combined <br />surface/subsurface mines <br />3.02.2(4) Adequacy of bond amount and terms <br />Midterm Review Methodoloey <br />Applicability at the <br />Eagle Mines <br />Inapplicable, no delay <br />has been requested or <br />approved. <br />Applicable. <br />For this Midterm Review, the Division reviewed the following documents: <br />1. Permit application, including stipulations and responses; <br />2. Revisions made to the permit since the last permit renewal; <br />3. Annual reclamation and hydrology reports: <br />4. Bond surety and reclamation cost estimate; <br />5. Division findings documents and previous Midterm Reviews; <br />6. Division inspection reports; <br />7. Notices of violations since last permit renewal, if any. <br />PART II - SUMMARY OF: OPERATIONS, REVISIONS TO PERMIT, VIOLATIONS, <br />STIPULATIONS, VARIANCES, AND BOND <br />Operations <br />Table 2, below, summarizes [he history of Permit C-81-044. <br />Table 2 -Summary of history of Permit C-81-044 <br />Table 1 - Summar of Histor of Permit C-81-044 <br />Date Permit Action <br />1936 Coal mining begins in vicinity of Eagle Mines. <br />Early 1970s Present operations begin with underground mining at No. 5 Mine. <br />1974 Open Mining Permit No. 41 issued for surface mining in Williams Fork <br />S[ri Pi[. <br />Eagle No. 5 and 9 Mines Page 3 February 13, 2001 <br />Midterm Review <br />