Laserfiche WebLink
May O5 98 09:40a <br />STATE OF <br />p.3 <br />DIVISION OF MINERALS ANO GEOLOGY <br />Dewnmem of Nawral ReSOUn:eS <br />1313 Sherman SI.. Room 2I S <br />Denver. Colorado 80201 <br />Phone: i10318G6-3567 <br />FAx:~lollalz-alo6 APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />NATURAL <br />RESOURCE <br />This form must be completed and submitted with all requests for minor revisions, as defined in Ror Raney <br />Rule 1.04(73), technical revisions, as defined in Rule 1.04(1361, and permit revisions, as defined r'pYCA1Of <br />iR Rule 1.04(90). All revisions are to address the requirements of Rule 2.08.4. Three 13) copies unk', s. luchhe,d <br />t:ecume oirenor <br />of the revision, including maps, must be submitted in order for it to be complete. <br />,~IiahiN 8. font <br />Oivmon Ovecrw <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables andlor figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections heing revised. <br />For federal mines, a copy of the revision applicadon must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distriburion must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non•Tederal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must ba submitted to the OSM Western Regional <br />Coordinating Center 11999 Broadway Blvd., Suite 3320, Denver, CO 80202-57331, and proof of submittal <br />to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C- 9 2 0 5 6 Date: Q~ 1 0 4 1~ 8 <br />Permittee: ~ ~ E ~ 1 Y M I L ~ _ _ - - - _ <br />~ C O ~_ L- C ~_ ~~ P A N Y-_- <br />Street: ~~~ 1~ R ~_ U T T- C O U ~ T Y <br />City: O ~_ ~_-.~ ~~ E K ----- - <br />State: C O Zip Code: ~ _0 ~, ~ 1 - - - <br />Brief Description of Revision: Adrii Linn of AchIP~C rF1CIrTP nfP AgrPP mcnTC Tn rPrmiT <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs) <br />Bond Increase: Yes _ Nom Federal Non-Federal -Mine <br />Proposed Change in: <br />Disturbed Area (+1-) _ _ 0 0 Acres <br />Permit Area (+l-) _ _ Q . ~ Acres <br />State Land (+l-) - _ 0 ~ Acres <br />Affected Area (+/-) - _ ~ ~ Acres <br />Federal Land (+/-) - - ~ ~ Acres <br />Private Land (+1-) - - ~ Q Acres <br />