Laserfiche WebLink
From: Jim Stover To: Joe DUAash Date: 7/27/00 Time: 3:36.12 PM <br />• • <br />J. E. STOVER 8~ ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />To: Joe Dudash <br />From: Jim Stover <br />Date: July 27, 2000 <br />Fax #: 832-8106 <br />Page: 1 of 1 <br />Subject: Bowie No. 2 Mine <br />Longwell Mining in Federal Coal <br />Permit C-96-083 <br />II{ IIIIIIIIIIIII III oa9e 1 of 1 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Message: Your letter dated July 24 explained the permitting process needed to allow <br />longwall mining in federal coal. Item 2 indicates a technical revision can be <br />submitted For approval of longwall mining in the D3 panel, provided BRL obtains <br />right-of-entry. <br />Did you intend to consider longwall mining in the D2 and D3 panel? There is <br />a small amount of federal coal at the end of both panels. <br />Please let me know. Also, your letter should probably be copied to Carl <br />Johnston at OSM so he is kept informed. <br />