Laserfiche WebLink
i <br />i niu iii <br />i <br />iii niii <br />(e) Cut-off surface casing below grade <br />and weld plate 100.00 <br />$ 3,190.00 <br />Hole E-)~ (564 feet) <br />(a) Install bridge plug <br />8 hours rig time @ $125/hour S 1,000.00 <br />bridge plug cost 500.00 <br />(b) Cement long-string casing outside to a <br />depth of 100 feet, 10 inches diameter <br />28 ft3 = 25 bags cement @ $5.00/bag 125.00 <br />(c) Cement long-string casing inside to a depth <br />of iD~ feet, 6.4 inches inside diameter <br />27 ft = 20 bags cement @ $5.00/bag 100.00 <br />(d) Pump truck and bulk cement truck <br />4 hours @ $250/hour 1,000.00 <br />(e) Cut-off surface casing below grade and <br />weld plate 100.00 <br />$ 2,825.00 <br />Total Cost <br />Reclaim pads and road $ 803.50 <br />E-1 sealing and plugging $ 3,520.00 <br />E-2 sealing and plugging $ 3,190.00 <br />~-fin sealing and plugging S 2,825.00 <br />$ 10,338.50 <br />M. Pond 005 Reclamation <br />Pond Removal 7,552 yd3 x $x.00 yd3 = 3 S 7,552.00 <br />Topsoil Placement 3,888 yd x $1.40/yd = 5,443.00 <br />Fertilizer, Seed, Mulch 5 Ac x $635/Ac =3 3 3,175.00 <br />Remove Sediment (assume 2' deep) 2,630 yd x $2.00/yd = 5,260.00 <br />Remove Pipeline 1,550 ft x $1.00/ft = 1,550.00 <br />Total $ 22,980.00 <br />Revised 10-10-88 <br />