Laserfiche WebLink
Mr. Kent Gorham, CMLRD <br />', October 19, 1992 -page 4 <br />configuration. Map M51, sheets 2 and 3, and appropriate hydrology and sedimentology parameter <br />tables have been revised and are enclosed. <br />23. Discrepancies noted have been corrected and the associated drainages have been re-modeled. <br />Revised Sedimot output and a revised Table 4.86 and 4.8-7 are enclosed. <br />24. The Surface Control Map (M2) has been revised and is attached. <br />25. A diversion has been added in the Grouse drainage to route a small area of disturbance into the <br />pond system. The diversion has been sized and is included on the enclosed revised Table 4.8-3. <br />Enclosed Sedimot output reflects any changes to the hydrologic model <br />Sincerety, <br />Larry W. Henderson <br />Sr. Environmental Engineer <br />]MM/LWI I!b <br />ICML.RD\~C7'19] <br />Enclosure <br />c J.M. Mat[ern <br />file <br />