Laserfiche WebLink
1 <br /> <br /> s <br /> 1 <br /> plan. I think there has been--I think the evidence indicates <br /> 2 there has been some damage out there, and there is some ongoing <br /> 3 damage to the off-site hydrological balance. <br />' 4 And I think that irrespective of what happens, I think <br /> 5 that is an area that is absolutely prime for a corrective action. <br /> 6 Wh <br />t th <br />t <br />ti <br />ti <br />i <br />-- <br />h <br />d <br />h <br />di <br />i <br /> a <br />a <br />correc <br />ve ac <br />on <br />s <br />we <br />ear <br />t <br />e <br />scuss <br />ons today, <br />' 7 and the debate about whether it be reclamation or restoration. <br /> 8 I have never heard the distinction made between those <br />' 9 in the fashion that they were made today. But I think that it is <br /> 10 very important upon Castle Concrete to work with the division to <br />' 11 come u <br />with a corrective <br />lan <br /> p <br />p <br />. <br />' 12 And that may involve restoration or reclamation, I am <br /> 13 not sure. And I am not prepared to specifically get into that <br />' 14 today. But to what extent and get out of the reclamation and <br /> 15 into restoration sort of an area, I think that the Division staff <br />' 16 is more capable on a technical basis to be addressing this then <br />' 17 the Board is this evening. <br /> 18 Be that as it may, however, I think the evidence is <br /> 19 clearly indicated that the disturbances that were occurring off <br /> 20 the road as materials were coming ofP the road as a result of the <br />' 21 berms that had been constructed, had been obvious to all parties <br /> 22 since the early 1980s. <br /> <br /> 23 And there have been--it is my understanding, there have <br />' 24 been many visits and especially by the Division staff out there <br /> 25 and in which this issue perhaps was discussed at different times, <br />