Laserfiche WebLink
1 <br />1 <br />' 36 <br />' <br /> 1 amendment. And because I don <br />t want to find out what the current <br />' 2 violation is,. and when I know it will hereafter we go through <br /> 3 all the merit then somebody will say, they are in current <br />' 4 violation. You couldn't probably issue them a permit. <br /> 5 And I think that the rule specifically says that an <br />' 6 t <br />t <br />i <br /> opera <br />or can reques <br />an cont <br />nuance. It can be granted for good <br />' 7 cause shown, and I think the good cause shown is we are now faced <br /> 8 with the violation, a corrective action plan, we are going to <br />' 9 have to meet these things. I think it will be relevant to your <br /> 10 consideration whether or not we can, in fact, work the Williams <br />' 11 C <br />id <br />b <br />d <br />l <br />th <br />t <br />ld <br />id <br /> anyon s <br />e <br />ase <br />on your new proposa <br />so <br />a <br />we wou <br />avo <br />any <br />' 12 future spills. <br /> 13 And the language goes on to say denial of the request <br />' 14 would result in Board's decision of consideration of proposed <br /> 15 action within the statutory or scheduled time period. <br />' 16 Mr. Nussbaum--and I don't want to still his thunder, <br />' 17 but he is going to say, you have got it within a 180 days of the <br /> 18 thing coming off. We pointed that out on 120 day last meeting. <br />' 19 But we feel that the operator--the rules of intent for the <br /> 20 operator to request a continuance. You must be aware that the <br />' 21 1977 proceedings was a two-and-a-half-year continuance--Castle <br /> 22 Concrete. That what we had. <br />' <br /> 23 We got our permit in 1980, and because of the public <br />' 24 input you have to be there or your out of there. But this is the <br /> 25 type of thing that has happened, we took all of the information <br />1 <br /> <br />