Laserfiche WebLink
V <br />Mr. Gilbert F. Rindahl - 5 - September 6, 1985 <br />RECLAMATION COSTS <br />(recalculated by CMLRD) <br />Major Disturbance: <br />Life of mine waste rock assume 20,000 yd3 @ $0.75/rd3 <br />reclamation cost $15,000.00 <br />.5 acre topsoil stockpile at South end of site <br />Ripping/scarifying - @ 1/2 ac/hr @ $50.00/hr $ 50.00 <br />Topsoiling - @ 1344 yds3/ac @ $0.80/yd3 531.00 <br />Seed - @ $200.00/acre 100.00 <br />Fertilize - @ $50.00/acre 25.00 <br />Mulch - @ 200.00/acre 100.00 <br />Subtotal $15,812.00 <br />Moderate Disturbance: <br />.2 acre of temporary haul roads <br />Ripping/scarifying - @ 1/2 ac/hr @ $50.00/hr $ 200.00 <br />Topsoiling - @ 1344 yds3/ac @ $0.80/yd3 2,150.00 <br />Seed, fertilize, and mulch - @ $450.00/acre 900.00 <br />5 acre sediment pond area - <br />Grading - 2,000 yds3/acre @ $0.80 $ 8,000.00 <br />Topsoiling - 1344 yds3/acre @ $0.80 5,376.00 <br />Seed, fertilize, and mulch - @ $450.00/acre 2,250.00 <br />10 acres undergoing topsoil distribution <br />1144 yds3/ac @ $0.80/yd3 $10,752.00 <br />Minor Disturbance: <br />20 acres undergoing revegtation <br />Seed, Fertilize, and mulch - @ $450.00 $ 9,000.00 <br />Total $54,440.00 <br />Doc. No. 3199 <br />