Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />J. EART HYORK - TOPSOIL/SUBSOIL REPLACENENT 8 SPECIAL HANDLING <br />Task k~ Task Description ~ Cost (f) <br />2 ~ Spreed topsoil, West Ridge ~ 53,970 <br />6 ~ Spreed topsoil, existing pit ~ f3,809 <br />8.8 ~ Place topsoil over shop foundation ~ 536 <br />9 ~ Spreed topsoil, plant end shop area ~ f2,562 <br />71 ~ Spread topsoil, other areas ~ f8,405 <br />75 ~ Spreed topsoil, peter storage pond ~ f332 <br />Subtotal (J): f19, 114 <br />sheet 6 of 10 <br />