Laserfiche WebLink
Colorado ~D ivision of Minerals and Geology <br />ESTIMATING FORM - 4XEEL LOADER NORK <br />Task #: 75 Prep. by: RCA Task filename M210-15 <br />Date 09/30/94 Permit tl:M-77-270 Mine: Snyder Quarry Y <br />_________...__ _________ _____________~r.___. <br />Permitting action Final reclamation - water storage pord <br />Task description Spread topsoil + <br />HWRLY EQUI PMEHT COST <br />Basic methine: CAT 966E <br />Attachment M1: ROPS Cab <br />Sheet 7 of 2 <br />Horsepower = 276 <br />Shift basis: 7/day <br />(DQI DSIi) <br />Cost Breakdown - Ownership = f37.3B <br />---------- - Operating-Loader = 522.97 700 X utilization <br />- Operator = 527.58 <br />- Total cost/hr = 'f75.93 Total fleet cost/hr = f75.93 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Final <br />volume = 887.0 LCY factor = N/A volume = 887.0 LCY <br />Quantity source/reference : Amena)nent appL ica[ion <br />X Swell source/reference Program <br />XOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, tlunp & maneuver) = 0.525 min. <br /> (cxB IiSA> <br />Cycle Time Factors: Factor (min.) <br />Material- Nixed materiel 0.020 (CHB I8~) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB I8A) <br />Truck Ownership- No adjustment - factor not applicable 0.000 (CXB i8A) <br />Operation- Constant operation -0.040 (CHB 76x) <br />Target- Nominal target 0.000 (CHB 76A) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />