Laserfiche WebLink
G. EARTXWORK - FINISH GRADING <br />Task M~ Task Description ~ Cost (f) <br />2.5 ~ Finish grade topsoil, West Ridge ~ f45) <br />6.5 ~ Finish grade topsoil, existing pit ~ 5393 <br />9.5 ~ Finish grade topsoil, plant and shop area ~ f212 <br />9.7 ~ Finish grade topsoil over shop fouMation ~ f5 <br />77.5 ~ Finish grade topsoil, other areas ~ 5866 <br />75.5 ~ Finish grade topsoil, rater storage pond ~ S50 <br />Subtotal (G ): f1,977 <br />N. EARTNYORK - STREAM CHANNEL CONSTRUCTION/RECONSTRUCTION <br />Task k~ Task Description ~ Cost (f) <br />S~total (N): <br />sheet 4 of 10 <br />