Laserfiche WebLink
Colorado Division of Minerals and Geology <br />EST IIIATING FORM - BULLD02ER IKNIK <br />Task #: 9.7 Prep. by: RCO Task File Name: M210-9.7 <br />Date: 10/03/94 Permit #:M-77-210 Mine: Snyder Quarry <br />Permit Action: Final reclamation - plant erd shop area <br />________________________________________________ <br />Tesk Description: Finish grade topsoil over shop foundation <br />HOURLY EDUI PMENT COST <br />____________________ Basic Machine: [et DBN Horsepower: 285 <br />Blade Type: Semi-Universal ---------- <br />Attachment #1: ROPS Cab Shift Basis: 1/day <br />Attachment #2: 3-shank ripper ---------- <br />Cost Breakdown: <br />-------------- Utilization X (code OfU) <br />Ownership cost/hr = f45.47 N/A <br />Operating 8 overhaul cost/h r- dozer = f40.44 100 <br />-ripper = f0.00 0 <br />Operator cost/hr = 521.58 N/A <br />Total egpt. unit cost/hr = (107.49 Total fleet cost/hr: (107.49 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 50.0 LCY Factor: N/A Volume: 50.0 LLY <br />Source of quantity take-off: Amendment application - calculated <br />Source of est. swell factor: program <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg, push distance: 50 ft. ---------------------- -------- <br />- -------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (Cat tbl) <br />dozer production: 1180 LCY/hr Dozing method..... 1.00 (pen.) <br />- -------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Loose stockpile Transmission type. 1.00 ( PS ) <br />--------------------- -------- -------- Grade adlustment.. 1.11 (Cat tbl) <br />Avg, push gradient: 5.00 X (nag) Altitude adj. .... 1.00 (Cat tbl) <br />- -------- MeteriaL weight... 1.00 (Cat tbl) <br />Avg. site altitude: 7150 ft. Blade type........ 1.00 (S or U) <br />Material weight 2300.00 lb/LCY Net Job Correction 0.83 <br />Ma[. Descr.: - -------- --- -------- <br />GENERAL FILL Adjusted Unit Prod.: 982.41 LCY/hr <br /> Adjusted Fleet Production: 982.41 LCY/hr <br />JOB COST -- ------- <br />Fleet size 1 Dozers) Total Job Time: 0.05 Hours <br />Unit Lost f0-109 /LCY Total Job Cost: 55.47 <br />