Laserfiche WebLink
Colorado Division of Minerals erd Geology <br />ESTIMATING FORM - YHEEL LOADER YORK <br />Task K: 6 Prep. by: RCO Task filename M210-6 <br />De[e :N 09/30/94 Permit q:M 77-210 Mine: Snyder Quarry r <br />Permitting action Final reclamation - Area YP <br />Task description Spread topsoil - exist irg pi[ <br />Sheet 1 of 2 <br />HOURLY EQUIPMENT COST <br />________________ ____ Basic machine: LAT 966E Xorsepouer = 216 <br />Attachment M1: ROPS Ceb Shift basis: l/day <br />(uQ[ bSli> <br />Cost Breakdown - Ownership = (31.38 <br />-------------- - Operating-loader = 522.97 100 X utilization <br />- Operator = 521.58 <br />- Total cost/hr = 575.93 Total fleet cost/hr = 275.93 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial SueLL Final <br />volume = 7,018.0 LCY factor = N/A volume = 7,018.0 LCY <br />Quantity source/reference Anerdrent eppl itat ion <br />% Swell source/reference Program <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.525 min. <br /> (CHB OSA)--- <br />Cycle Time Factors: Factor (min.) <br />Material- Nixed materiel 0.020 (CNB IEA) <br />Pile- Conveyor or dozer piled 10 ft. high 8 0.000 (CHB fEA) <br />Truck Ownership- No edj ustment - fec [or not applicable 0.000 (CHB fETi) <br />Operation- Constant operation ~ -0.040 (CHB IEA) <br />Target- Nominal target 0.000 (CXB fEx) <br /> Net Cycle Time Adj.= -0.020 min. <br /> Adj. Basic Cycle Time = 0.505 min. <br />