Laserfiche WebLink
PHASE VI <br />ITEM DESCRIPTION UNR QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 24,830 $ 2.00 49,600.00 <br />3 Place Top Soil CY 23,130 1.50 34,695.00 <br />4 Seed, Mulch, Tack, & Fertilize <br />Pit Floor TYPE "A" AC 18 125.00 2,250.00 <br />5 Seed, Mulch, Tack, & Fertilize <br />Side Slo es TYPE "B" AC 3 420.00 1,260.00 <br /> Subtotal $89,805.00 <br />6 Indirect Costs LS 2,695.00 <br /> Subtotal 92,500.00 <br />7 Project Management LS 6,285.00 <br /> TOTAL PHASE VI 98,785.00 <br />PHASE VII <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 0 $ Z.00 0.00 <br />3 Place Top Soil CY 7,350 1.50 11,205.00 <br />4 Seed, Mulch, Tack, & Fertile <br />Pit Floor TYPE "A" AC 7 125.00 875.00 <br />5 Seed, Mulch, Tack, & Fertilize <br />Side Slo s TYPE "B" AC 0 420.00 0.00 <br /> Subtotal $14,080.00 <br />6 Indirect Costs LS 425.00 <br /> Subtotal 14,505.00 <br />7 Project Management LS 985.00 <br /> TOTAL PHASE 11 !5,490.00 <br />TOTAL ALL PHASES = $639,837.00 <br />Rev. 08/10/03 <br />